It’s gettin’ hot in here

Following news that the 2010s were some of the hottest years on record, Nick Osborne, data centre specialist for Aggreko, explores how providing sufficient air conditioning equipment is a key measure to avoiding overheating and that dreaded downtime.

As global temperatures continue to rise and adverse weather conditions become more prevalent, controlling and mitigating the vast amount of heat that data centres produce is a more pressing issue than ever for the sector. With over 175 zettabytes of data predicted to be in existence by 2025, it is even more vital that existing and future data centres have the correct infrastructure in place to ensure heat generated by server racks and IT apparatus is balanced.

Cooling systems, both liquid and air-derived, are available to data centre providers to suit the requirements of facilities of all sizes and outputs. However, a survey by Science Direct found that 61% of data centres are running at low efficiency, particularly thanks to unsuitable cooling systems. With this in mind, it is vital that data centre providers understand the requirements of their facility and can benefit from the expertise of a specialist to select the best cooling solution.

Extreme heat causes downtime

Climate change is a contentious topic across all industries, not least the data centre sector. With the market predicted to account for a third of global electricity consumption, as well as 3.2% of worldwide carbon emissions by 2025, the growth of the data centre industry threatens further climate change and ensuing effects on weather and temperature.

High temperatures and humidity that could become commonplace in the future are conditions that spell disaster for data centres. Equipment in these facilities produce vast amounts of heat as it stands, and, with elevated temperatures from extreme weather patterns, the risk of overheating becomes higher than ever.

The large amounts of heat generated by server racks and IT apparatus have been a long-standing concern for companies across many industries. With worldwide spending on data centres hitting

$93bn in 2019 according to Synergy Research Group, it is no surprise that stakeholders want to prevent downtime and the ensuing costs that come from it.

As technological advancement drives further implementation of innovations, such as edge computing, artificial intelligence and IoT, new hardware to satisfy the higher demand of the data centre will produce even larger amounts of heat. Companies investing in advanced technologies to enhance their offering means not only will data centre providers need to construct more facilities, but will also need to more carefully consider how they will cool equipment with more advanced hardware.

The rises in temperature caused by by-product heat within a facility can affect infrastructure performance and lead to potential disruption and plant failure – consequences data centres and businesses reliant on server rooms are keen to avoid. Therefore, it is of paramount importance that IT professionals and data centre managers carefully consider whether their existing cooling equipment is suitable for their business’ needs.

Keeping cool

When it comes to removing heat in data centres, the two most common methods currently in use are air or water-cooled systems. As higher temperatures begin to put data centres of all sizes at risk of overheating, it is vital that providers select the correct solution for satisfying the requirements of their facility.

An air-cooled system delivers cold air into the data centre or server room, extracting warm air from the room, mixing both to eliminate hot spots. This approach is most applicable for data centres and facilities with comparatively smaller power load densities, where the power load required for the mixing process is a small fraction of the facility’s total power load. Where this is not the case, the system’s efficiency declines. Instead of balancing the temperature of the room, a water-cooled system transfers chilled water to exactly where it is required – the server racks and computer banks. This targeted approach is more efficient for companies operating larger data centres or server rooms.

Though cooling systems of these types are usually installed as a permanent fixture within a data centre, temporary rental of cooling solutions may also need to be employed with extreme hot weather patterns occurring more frequently than ever. With data centres already using more and more power than ever before and the resulting impact on the environment a key industry concern, temporary solutions will alleviate the effects of a sudden heat wave without permanently using large amounts of power across a facility’s lifespan.

Within a data centre that uses free cooling, a system where cool air is supplied directly from the outside in cold weather locations, such temporary solutions, may be required in unusually warm conditions that may suddenly occur. As a contingency strategy, the implementation of chiller stab points within the cooling system allows for pre-existing access points for temporary chilling solutions to be quickly installed, ensuring downtime is kept to a minimum.

It must be noted that no two sites are the same, and may be subject to a wide array of changing variables such as temperature, humidity levels and available space. So, before selecting air conditioning and cooling equipment, a site survey should be carried out to clarify the site’s power and temperature requirements, and what environmental factors need to be considered.

Finding the right solution

Specifying the right temperature control system can be a highly technical task, usually requiring an expert in heating, ventilation and air conditioning to develop a bespoke plan. With this in mind, it is advisable companies use a third party to carry out this service.

Whether it is a long-term solution for temperature control, or a short-term hire of a system to alleviate the effects of sudden heatwaves or extreme weather fronts, choosing the right cooling equipment for a data centre is vital to avoiding downtime and added cost. Being sure of the facility’s demand, the weather patterns in its location and, crucially, consulting an expert of data centre temperature control will ensure such issues do not occur.

You may also like

Stay In The Know

Get the Data Centre Review Newsletter direct to your inbox.