In the Spotlight… Solving the data centre power challenge with RSE’s Peter Glenn
RSE’s Peter Glenn explores on-site generation options and the factors data centre developers must consider as grid constraints continue.
Sponsored
Engineering uptime in high density data centre cooling
With AI increasing data centre cooling demands, Innomotics explores how integrated motor and drive design can help.
Reports
Trend Report: From backup to backbone – why battery strategy is changing in 2026
Racks drawing 132 kW today and pushing towards 1 MW tomorrow are redefining how data centres think about resilience. Cooling can no longer rely on thermal ride-through, which means UPS systems must now safeguard pumps, CDUs and controls as well as IT loads. The result: cooling and power are converging into one integrated design challenge.
Sponsored
A cleaner start: Why pipework preparation is critical to liquid cooling performance
Before liquid cooling systems go live, pipework must be properly prepared to prevent debris, contamination and avoidable commissioning issues.
Sponsored
Establishing reliable standards for direct-to-chip cooling
Cooling is a mission-critical system that directly impacts performance, uptime, and operational efficiency. Direct-to-chip liquid cooling is the solution.
Sponsored
How to build reliable liquid cooling systems
Ecolab's Bob Walicki explains how effective commissioning can create the foundation for reliable, long-term liquid cooling operations.
Sponsored
Faster asset audits and interventions
As data centres become denser, smarter labels, QR codes and RFID can speed audits, reduce errors and keep physical assets aligned with DCIM databases.
Sponsored
Why on-site power assembly no longer makes sense