By the time a data centre goes to planning, decisions about where it sits and how it looks may already be hard to change. Muhammad Khan, Principal and Mission Critical Studio Practice Leader at HKS, makes the case for involving local people earlier.
The challenge facing planners, developers and investors is not simply to deliver the capacity the country needs, but to ensure there is sustained momentum behind the sector well into the future. That momentum will only be achieved if new data centres are developed with the support, goodwill and sense of ownership of local communities and planning authorities.
When communities are not consulted from the outset, the first time many people hear about a proposed data centre is when a pre-planning application emerges. By that stage, opinions have often already been formed. Members of the public may perceive data centres as large, featureless grey boxes that generate disruptive noise and detract from the local environment. Planners may anticipate increased traffic and pressure on local road and transit infrastructure. Both groups might assume that a new data centre will place additional strain on roads, water supplies and energy networks.
Engagement must begin before planning
This is precisely why early community integration and design engagement are so important, ideally beginning during feasibility studies and at RIBA Stage 0. Engaging local stakeholders at the earliest possible stage helps project teams address misconceptions, challenge outdated assumptions and build trust with the people who will ultimately live and work alongside these facilities. It also creates an opportunity to communicate the role data centres play in supporting the digital services on which modern society increasingly relies.
For example, many advanced data centres now operate using highly efficient closed-loop cooling systems that consume significantly less water than many other industrial processes. At the same time, innovative energy strategies, including on-site renewable generation, hydrogen-powered backup systems and battery energy storage systems (BESS), can help facilities interact more effectively with the wider electricity grid while reducing carbon emissions. Newly developed acoustic mitigation measures enable operators to significantly reduce noise impacts in sensitive locations, while the relatively low occupancy levels associated with data centres, particularly when compared with logistics or industrial facilities, can help alleviate concerns about traffic generation and pressure on local services.
Listening should shape the design
These early conversations are essential to bringing community leaders and local authority planners on side through education and transparency. However, the exchange of knowledge should flow in both directions. Just as communities can learn more about how modern data centres function, developers and designers can gain invaluable insight into local priorities, aspirations and concerns. Architects, planners and engineers need to listen carefully to understand local character, heritage and aesthetic preferences, as well as existing land uses and environmental conditions.
This dialogue can inform a considered approach to site planning and architecture. It may influence where a facility is positioned within a site, how landscape design and access are integrated, or how the building’s appearance responds to the surrounding context. Façade treatments, materials and public-facing elements can all be tailored to reflect local identity and respond to feedback from residents and stakeholders.
The design team plays a critical role in translating these conversations into proposals that complement and enhance the local area. This could involve enhancing biodiversity, incorporating green roofs, integrating rainwater harvesting and reuse systems, or creating attractive landscaping that improves the visual quality of a site. Such design measures can help transform perceptions of what data centres look like and how they contribute to their surroundings.
Looking beyond the industrial estate
Learning from best practice, both internationally and within the UK, can also help make data centres more widely accepted. In the Nordic countries, an increasing number of data centres are being connected to district heating networks, allowing waste heat to support local homes and businesses. In the UK, some clients are exploring ways to provide additional value to local communities by integrating technology education, AI training programmes and skills development opportunities within wider campus strategies. In the Middle East, meanwhile, large-scale developments are increasingly adopting a holistic approach, combining homes, data centres, cultural facilities, commercial space and public parks within integrated masterplans.
While every location has its own unique context and constraints, there is an opportunity to learn from these approaches and adapt them where appropriate. With thoughtful design and meaningful community engagement, data centres can become far more than simply productive sheds on industrial estates. They have the potential to support wider regeneration objectives, create opportunities for learning and employment, and become valuable assets that contribute positively to local economies and communities.
Giving communities a sense of ownership
Developing and sharing these narratives, while giving local people genuine agency within the decision-making process, helps foster a sense of ownership and connection. That sense of ownership can be just as important as the broader economic benefits associated with data centre development, including investment, construction jobs, apprenticeships, workforce upskilling and the creation of more resilient digital infrastructure.
Ultimately, these facilities support the systems and services on which society depends, from scientific research and healthcare to banking, transport, communications and entertainment. More than a planning exercise, engagement on site selection, master-planning and architecture should be developed in parallel using meaningful community consultation, rather than becoming a sequential box-ticking exercise. Only then will the industry deliver both the capacity the UK needs and places that communities are proud to support.